Testing Tool Load Runner

Duration : 30 Hrs
Who can learn this course:
  • PerformanceEngineers, Quality Assurance Engineers, and Performance Center of Excellence Managers.
 Pre Requisite:
  • Working knowledge of Quality Assurance testing processes, the software

development lifecycle, Windows and UNIX operating systems, and Microsoft Office products.

  End Objective:
  • UnderstandBusiness Technology Optimization and the BTO engagement model
  • Understand the Performance Center ofExcellence and PCoE maturity model
  • Effectively plan a performance test based on measurable objectives
  • Create realistic load tests based onindustry best practices
  • Implement a repeatabletest execution methodology every time
  • Report results effectively to technical and non-technical audiences
  • Tie performance results back to business objectives

Introduction to Performance testing


Need of performance testing

Introduction to performance testing definitions and concepts
  • Bench mark testing
  • Load test
  • Step test
  • Volume test
  • Stress test
  • Soak test (long run test)
Introduction to Load Runner
  • Vu generator
  • Recording options
  • Runtime settings
  • Controller
  • Design mode
  • Run mode
  • Analysis
Introduction to Performance testing process followed in real time project
Introduction to scripting with Vugen
  • Script enhancement
  • Parameterization
  • Correlation
  • Manual correlation
  • Auto correlation
Testing with Load runner controller:
  • Scenarios creation in controller
  • Load testing
  • Bench mark test
  • Step test
Discussion on interview questions and Answers


No reviews

Post Review

Review Title
Review Content
View All Categories

Quick Enquiry

Technology Portfolio